[1]
Zheng, W. et al. 2025. Intelligent Equipment Scheduling Optimization Model for Transmission Lines Based on Improved BFO Algorithm. EAI Endorsed Transactions on Energy Web. 12, (Apr. 2025). DOI:https://doi.org/10.4108/ew.4983.