[1]
Wu, J. and Li, X. 2026. A State-Updated Constraint Propagation Method for BIM–Digital Twin-Driven Local Rescheduling in Prefabricated Component Manufacturing. EAI Endorsed Transactions on Scalable Information Systems. 13, 6 (Oct. 2026). DOI:https://doi.org/10.4108/eetsis.13902.