[1]
Li, R. et al. 2026. An Integrated Digital-Twin-Assisted Edge Collaboration and LSTM-GAT Model for Short-Term Power Load Forecasting in Industrial Parks. EAI Endorsed Transactions on Scalable Information Systems. 13, 7 (Nov. 2026). DOI:https://doi.org/10.4108/eetsis.14155.