(1)
K. R, A. K.; J. , E. R. D. Mitigation of Make Span Time in Job Shop Scheduling Problem Using Gannet Optimization Algorithm. EAI Endorsed Scal Inf Syst 2023, 10 (5). https://doi.org/10.4108/eetsis.2913.