(1)
Wu, J.; Li, X. A State-Updated Constraint Propagation Method for BIM–Digital Twin-Driven Local Rescheduling in Prefabricated Component Manufacturing. EAI Endorsed Scal Inf Syst 2026, 13 (6). https://doi.org/10.4108/eetsis.13902.