Wu, J., & Li, X. (2026). A State-Updated Constraint Propagation Method for BIM–Digital Twin-Driven Local Rescheduling in Prefabricated Component Manufacturing. EAI Endorsed Transactions on Scalable Information Systems, 13(6). https://doi.org/10.4108/eetsis.13902