Li, R., Li, H., Wong, Y. S., Long, F., Jiang, D., & Wu, J. (2026). An Integrated Digital-Twin-Assisted Edge Collaboration and LSTM-GAT Model for Short-Term Power Load Forecasting in Industrial Parks. EAI Endorsed Transactions on Scalable Information Systems, 13(7). https://doi.org/10.4108/eetsis.14155