[1]
J. Wu and X. Li, “A State-Updated Constraint Propagation Method for BIM–Digital Twin-Driven Local Rescheduling in Prefabricated Component Manufacturing”, EAI Endorsed Scal Inf Syst, vol. 13, no. 6, Oct. 2026, doi: 10.4108/eetsis.13902.