Correction: Improving construction project management through the application of AI, BIM and GIS at the construction investment project management board: The case of Viet Nam

Authors

DOI:

https://doi.org/10.4108/tsoe.14432

Abstract

Correction to: Thanh-Tu Huynh, Van-Nam Vo (2026) Improving construction project management through the application of AI, BIM and GIS at the  construction investment project management board: The case of Viet Nam. https://doi.org/10.4108/tsoe.12993

The manuscript has been updated to include Acknowledgments section with the following statement: 

In this article, the Canva image processing application was used by the authors to construct the images illustrating the integration process (Figure 1) and the analysis diagram (Figure 2). This does not affect the analysis and evaluation of the research results presented in the article.

The original article has been updated. 

Downloads

Download data is not yet available.

References

Downloads

Published

11-08-2026

How to Cite

1.
Correction: Improving construction project management through the application of AI, BIM and GIS at the construction investment project management board: The case of Viet Nam. EAI Endorsed Trans on Trans and OE [Internet]. 2026 Aug. 11 [cited 2026 Aug. 11];2(1). Available from: https://publications.eai.eu/index.php/tsoe/article/view/14432