Correction: Improving construction project management through the application of AI, BIM and GIS at the construction investment project management board: The case of Viet Nam
DOI:
https://doi.org/10.4108/tsoe.14432Abstract
Correction to: Thanh-Tu Huynh, Van-Nam Vo (2026) Improving construction project management through the application of AI, BIM and GIS at the construction investment project management board: The case of Viet Nam. https://doi.org/10.4108/tsoe.12993
The manuscript has been updated to include Acknowledgments section with the following statement:
In this article, the Canva image processing application was used by the authors to construct the images illustrating the integration process (Figure 1) and the analysis diagram (Figure 2). This does not affect the analysis and evaluation of the research results presented in the article.
The original article has been updated.
Downloads
References
Downloads
Published
Issue
Section
License

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
This is an open access article distributed under the terms of the CC BY-NC-SA 4.0, which permits copying, redistributing, remixing, transformation, and building upon the material in any medium so long as the original work is properly cited.